LSO Manual
You can download the full PDF here: Scottish Site Operators Manual (PDF).
If your browser supports this, the PDF is also available to view below within this page and you can use the contents list to quickly jump to a specific section.
Please Note: The jump links may not work correctly if you are not using the Adobe Acrobat plugin (users of Firefox and Chrome likely to be affected).
» Find out how to enable the Adobe Acrobat plugin (opens in a new window)Note: To open the links to YouTube within the document, right click and open in a new tab or window. This page may not work correctly on mobile or tablet devices.
- Title Page
- Contents Page
- 1 Introduction
- 2 About Scottish Air Quality Monitoring
- 3 Roles and Responsibilities
- 4 Quality Assurance/Quality Control Objectives
- 5 Data Requirements
- 6 Site Selection
- 7 Monitoring Instrumentation
- 8 Monitoring Station Infrastructure
- 9 Principles of Calibration
- 10 Health and Safety
- Part_B Part B - Site Operational Procedures
- 11 API Equipment - Site Operations Procedures
- 12 Thermo Fisher I Series Equipment - Site Operational Procedures
- 13 Monitor Labs 98 Series Equipment - Site Operational Procedures
- 14 Monitor Labs 98 Series Equipment with Envidas Data Logger - Site Operational Procedures
- 15 CM20XX Casella Monitor Equipment - Site Operational Procedures
- 16 Horiba Equipment 360 Series - Site Operational Procedures
- 16.1 Introduction
- 16.2 Preparation
- 16.3 Pre calibration Checks
- 16.4 Analyser Calibration Procedure
- 16.5 Changing Analyser Sample Inlet Filters
- 16.6 Post-calibration Checks, Safety and Security Inspection
- 17 Horiba Equipment 370 Series - Site Operational Procedures
- 18 R&P TEOM 1400 - Site Operational Procedures
- 19 TEOM FDMS Analysers - Site Operational Procedures
- 20 FIDAS 100/200/300 - Site Operational Procedures
- 21 Beta Attenuation Monitor Model 1020 Site Operational Procedures
- 21.1 Introduction
- 21.2 BAM Main Menu and Key Board Functions
- 21.3 Preparation
- 21.4 Pre and Post Calibration checks
- 21.5 Modem (where fitted)
- 21.6 Cleaning the PM10 Head
- 21.7 Cleaning the Collector Assembly (Monthly)
- 21.8 Cleaning the Acceleration Assembly (Quarterly
- 21.9 Clean the Nozzle and Vane
- 21.10 Clean Sharp Cut Cyclone (SCC) (PM2.5 only)
- 21.11 Filter TApe Installation
- 21.12 BAM Error Codes
- 22 Calibration Sheets
- 23 Site Audits and Intercalibration Visits
- 24 Non-routine Site Visits
- 25 Troubleshooting
- 26 References
- Appendices
- Appendix A - Example of Service Contract Specification
- Appendix B - Safety Data Sheets for Gases
- Appendix C - Glossary of Abbreviations and Conversion Factors
- Appendix D - Calibration Sheet
- Appendix E - Equipment Support Unit Procedures